An event risk assessment is not paperwork you complete once and file away. It is a practical process for identifying what could go wrong, understanding who could be harmed and deciding how risks will be controlled before guests, suppliers and staff arrive onsite.
For Australian corporate organisers, that can mean assessing everything from crowd movement and temporary structures to electrical equipment, contractor activity, weather, accessibility and emergency procedures.
The exact documentation required will depend on your state or territory, venue, event type and activities involved. However, a well-prepared assessment should clearly show the hazards considered, how risks were evaluated, the controls selected, who is responsible and how those controls will be monitored.
Here is how to approach the process in a way that is useful on event day, not simply compliant on paper.

What Is an Event Risk Assessment?

An event risk assessment is a documented review of hazards associated with planning, setting up, operating and dismantling an event.
It considers two fundamental questions:
  1. How likely is something harmful to happen?
  2. How serious could the consequences be?
From there, organisers determine what controls are needed to eliminate the risk where possible or minimise it where elimination is not reasonably practicable.
Safe Work Australia describes risk management as a continuing process of identifying hazards, assessing risks, controlling risks and reviewing the effectiveness of those controls.
For a corporate event, hazards might include:
  • Slips, trips and falls
  • Electrical cables and temporary power
  • Stage, lighting and audiovisual equipment
  • Loading and unloading activities
  • Crowd congestion
  • Emergency access being obstructed
  • Manual handling during bump-in and bump-out
  • Food or catering hazards
  • Outdoor weather conditions
  • Temporary structures
  • Contractor and supplier activities
  • Accessibility and movement through the venue
Your event safety plan in Australia may contain the risk assessment alongside emergency procedures, contractor information, site plans, incident processes and other operational documents.

What Are the 5 Things a Risk Assessment Should Include?

A practical event risk management plan should document at least five core elements.

1. The Hazard

Describe what could cause harm.
Be specific. Rather than writing “cables”, for example, record “power and AV cables crossing the attendee access route”.

2. Who Could Be Affected

Identify the people exposed to the hazard.
This may include:
  • Guests
  • Employees
  • Contractors
  • Performers
  • Speakers
  • Venue staff
  • Members of the public
Different groups may require different controls.

3. The Level of Risk

Evaluate the likelihood of an incident and the potential severity of its consequences.
Many organisers use a risk matrix to classify risks as low, medium, high or extreme according to an organisation’s chosen methodology.

4. Control Measures

Document what will be done to eliminate or reduce the risk.
For cables across a walkway, for example, the preferred solution may be rerouting them away from pedestrian areas rather than simply placing a warning sign beside them.
Safe Work Australia recommends eliminating a risk where reasonably practicable and, where that is not possible, using the hierarchy of control measures to minimise it.

5. Responsibility and Review

Record who is responsible for implementing the control and when it must be checked.
A control without an owner can easily become an assumption.

What Are the 5 Basic Steps to Risk Assessment?

Australian WHS guidance commonly describes risk management as four core stages: identify, assess, control and review. For event planning, it is useful to turn these into a practical 5-step risk assessment workflow by separating implementation and responsibility from the selection of controls.

Step 1: Identify the Hazards

Walk through the complete event lifecycle:
Bump-in → rehearsals → guest arrival → live event → guest departure → bump-out
Hazards during installation can be very different from those during the event itself.

Step 2: Assess the Risk

Consider:
  • What could happen?
  • Who might be affected?
  • How severe could the harm be?
  • How likely is it to happen?
  • Are existing controls sufficient?

Step 3: Select Appropriate Controls

Look for ways to remove the hazard first. Where that cannot reasonably be done, reduce exposure using effective physical, engineering or administrative controls.

Step 4: Document and Assign Responsibility

Record:
  • The agreed control
  • The responsible person
  • When it must be completed
  • Any required inspection
  • Supporting documentation
This turns a risk assessment into an operational document.

Step 5: Monitor and Review

Conditions change.
A supplier may reposition equipment, weather may deteriorate, attendance may exceed forecasts, or an access route may become congested.
Controls should therefore be reviewed when circumstances or risks change, not simply at the beginning of the project. Safe Work Australia also emphasises that risk controls need ongoing review to ensure they remain effective.

Can You Give Me an Example of a Risk Assessment?

Consider a corporate conference with staging, AV production and several hundred attendees.

Hazard Potential Risk Control Responsibility
AV cables near attendee walkway Trip and fall Route cables away from walkway where possible and securely protect unavoidable crossings AV supplier
Congestion at registration Crushing, falls or blocked access Create separate queues, provide adequate registration staff and keep emergency routes clear Event manager
Heavy equipment during bump-in Manual handling injury Use suitable lifting equipment, trained crew and controlled loading zones Production supplier
Emergency exit obstruction Delayed evacuation Inspect exits before doors open and maintain clear access throughout event Venue and event manager
The exact format will vary, but the document should make it immediately clear what the hazard is, how it will be controlled and who owns the action.
For events where crowd movement is a significant consideration, a separate crowd management plan may also support the broader risk assessment.

TELL US MORE

Launch, conference, activate, celebrate, exhibit. Let’s create something that moves.

How Do I Write a Risk Assessment?

Start with the actual event, not a generic template.
Visit the venue where possible and speak with the venue, production suppliers, security, catering and other contractors about the risks created by their activities.
Then build your event risk assessment template around fields such as:
  • Activity or location
  • Hazard
  • People exposed
  • Existing controls
  • Likelihood
  • Consequence
  • Risk rating
  • Additional controls required
  • Responsible person
  • Completion date
  • Residual risk
  • Review status
Keep descriptions specific enough that another member of the event team can understand exactly what needs to happen.

Can I Write My Own Risk Assessment?

Yes, organisers can prepare their own assessment where they have the knowledge and capability to identify and manage the relevant risks.
However, that does not mean every risk should be assessed without specialist input.
Production suppliers, venue teams, engineers, security contractors, electricians and other specialists may need to provide documentation or advice for activities within their expertise.
Requirements can also differ between Australian jurisdictions and venues. Safe Work Australia develops national WHS policy, while WHS laws are regulated and enforced by Commonwealth, state and territory authorities.
For complex or higher-risk events, specialist safety advice may be appropriate.

What Are the 5 Risk Assessment Tools?

There is no single set of five tools that every corporate event must use. However, these are particularly useful in event planning.
  1. Risk matrix: Compares likelihood and consequence to prioritise risks.
  2. Hazard checklist: Provides a structured way to inspect the venue, activities and event phases.
  3. Risk register: Brings hazards, ratings, controls, responsibilities and review status into one central record.
  4. Job safety analysis: Breaks particular tasks into stages so hazards and controls can be considered in detail.
  5. Bow-tie analysis: Helps visualise the causes of a serious event, preventative controls and measures designed to reduce the consequences.
WorkSafe Victoria’s major-event safety guidance includes examples of risk assessment methods, checklists, job safety analysis and bow-tie analysis as tools that can support event safety planning.
The important point is not how many tools you use. It is whether the chosen method helps the team identify meaningful risks and act on them.

Make Risk Planning Part of Event Planning

The strongest event risk assessments are practical documents that evolve with the event. They identify hazards clearly, assign responsibility and give the people delivering the event a shared understanding of how risks will be managed.
For corporate conferences and summits, safety planning also needs to work alongside venue logistics, production, attendee movement and the live event schedule. If you need support bringing those elements together, explore Unbelievable Group’s conference and summit event services.

Frequently Asked Questions

Is an event risk assessment legally required in Australia?

WHS and occupational health and safety duties apply to relevant businesses and event activities, but specific obligations vary by jurisdiction and circumstances. Check the requirements of your state or territory regulator, venue and any applicable permits.

When should an event risk assessment be completed?

Start it during planning, then update it as the venue, suppliers, production design and event schedule become clearer. Conduct another review before opening and whenever conditions materially change.

Who should be involved in an event risk assessment?

The event organiser should coordinate the process with relevant venue representatives, employees, contractors and specialists. Consultation is an important part of Australian WHS risk management.

Is a risk assessment the same as an event safety plan?

No. A risk assessment identifies hazards and controls, while a broader event safety plan may also contain emergency arrangements, site information, responsibilities, communications and incident procedures.

Should emergency scenarios be included?

Yes. Consider credible scenarios relevant to the event and establish appropriate responses. Your planning should also connect with venue emergency arrangements. For further preparation, see our guide to event crisis management.